1) PVC Material
2) Specifical for purifying biogas
3) 20yerars use life
The major function of the equipment is to get rid of water vapor from the biogas.
Instruction:
1. The major function of the equipment is to get rid of water vapor from the biogas. During the process that the biogas diffuses upward to the outlet pipe, water vapor will go into an umbrella-typed code plate and get condensed. Then water drop will stream down along the cold plate to the fringe and flow the bottom along the inner wall of the dewatering device.
2.The equipment is fit for the 300CBM biogas engineering.
No comments:
Post a Comment